Hot Gas Generator

Engineering and Construction of Hot Gas Generator System which comprises of soil investigation, site survey & layout, site clearing, concrete breaking, engineering design and investigation, detailing, supply of materials, labor, equipment, installation of cleated belt conveyor, installation of bin and rice husk furnace, ducts, design and installation of booster fan, blower foundation and its supports, screw conveyors, piping supports, engineering and construction of MCC and sub-control room, construction of drainage system, supply and installation of pin gate/grizzly bar, installation of discharge chute, modification of ball mill feeding, installation of rotary feeder/ disk feeder, engineering and installation of firefighting system, CO2 suppression system and etc.