Project: Silo As-Built Drawing Generation (Holcim, Norzagaray)
Work descriptions:
- Design analysis of Gondola
- Design analysis of A-frame support
- Design analysis of scaffolding
- Coordinates technical matter
- Investigation of existing structure
- Checking of technical report
Project: AFR ILC feeding (Holcim, Bulacan)
Work descriptions: Structural Designer/Manager
- Design analysis of conveyor support
- Design analysis of feeder support and housing
- Estimate bill of quantities
Project: Holcim Cementos Apasco (FCB)
Work descriptions: Structural Designer
- Design analysis of ducts, stacks and chimney including supports
- Design analysis of transition duct using finite element method
- Check design connections and detail drawings
- Coordinates technical matter
- Design analysis concrete foundation of chimney
Project: HOLCIM Costa Rica
Work descriptions:
- Propose and evaluate 10,000T clinker silo for design stage
- Propose and evaluate 20,000T cement silo for design stage
Project: Holcim Mabini Pier Side conveying upgrade
Work descriptions:
- Fabrication, supply of materials
- Construction, installation and commissioning assistance for belt conveying system, dust collector, transfer tower etc.
- Review and evaluation of engineering drawings.
- Preparation of civil/structural technical drawings & proposal
- Prepare material quantity and cost estimates
Project: Bulacan Wall right (Holcim Philippines Inc.)
Work descriptions:
- Coordinates technical matter
- Design analysis of pan conveyor
- Bucket elevator tower design analysis
- Transfer tower design analysis
- MCC design analysis
Undertaken by our Structural Engineers from PEGSEA