Project: Smokestack
Work descriptions:
- Design analysis of smoke stack using FEM
- Investigate existing support
- Check design connections and detail drawings
- Retrofits existing support
- Coordinates technical matter
- Design analysis of sliding support
- Design ring plat forms
Project: Kiln Shell Replacement
Work descriptions:
- Proposed structural concept and G.A.
- Design analysis and construction of kiln tower support
- Equipment plat forms design
- Kiln roller support design
- Sling design
- Saddle design
Project: RDF-Rice Husk Reception & Handling (Solid Cement Corporation)
Work descriptions:
- Coordinates technical matter
-Mat & isolated foundation design / Design analysis of Storage house 60m x 16m x 22m
– Retaining wall design
– Structural steel frame design
– Beams, columns and slab design
- Crane girder and crane beam design
- Bucket elevation tower design
- Conveyor gallery and integral parts design
- equipment plat forms design
Project: Dust Collector LST Transfer Tower (Solid Cement Corporation)
Work descriptions:
- Proposed structural concept and G.A.
- Coordinates technical matter
- Design analysis of de-dusting house
– isolated foundation design
– Wall design
– Structural steel frame & connection design
– Beams, columns and slab design
- Investigation of existing structure
- Retrofitting of existing transfer tower
- Conveyor gallery and integral parts design
- equipment plat forms design
Project: Solid CEMEX Antipolo, Clinker Crusher Roller
Work descriptions: Engineering Director
- Fabrication, supply of materials
- Construction, installation and commissioning and assistance for clinker crusher roller.
- Review and evaluation of engineering drawings.
- Preparation of civil/structural technical drawings & proposal
- Prepare material quantity and cost estimates
Project: Clinker Storage Structural Assessment” (Solid Cement Corporation, Antipolo)
Work descriptions: Structural Designer/Manager
- Conduct as-built drawing and site reconnaissance
- Conduct quantitative and qualitative analysis of the structure
- Conduct testing and validation of materials
- Preparation of reports and recommendation for building assessment
Project: Coal Storage Structural Assessment” (Solid Cement Corporation, Antipolo)
ork descriptions:
- Structural Designer/Manager
- Conduct as-built drawing and site reconnaissance
- Conduct quantitative and qualitative analysis of the structure
- Conduct testing and validation of materials
- Preparation of reports and recommendation for building assessment
Project: Engineering Services for Clinker Storage and material handling “Dome technology” (Solid Cement Corporation)
Work descriptions: Structural Designer/Manager
- Design analysis of transfer tower
- Design analysis of dome foundation
- Design analysis of pent house
- Design analysis of pan conveyor gallery
- Design analysis of reclaim tunnel
- Design analysis of steel trusses
- Dome shell design checking
Undertaken by our Structural Engineers from PEGSEA